Levstal fabricated the bifurcated pipeline for the hydropower plant according to the customer’s drawing. The project was made in parts; there were 8 parts in total. We made the blank, roll, assembly, welding, nondestructive testing, painting, and delivery.
Technical data:
Steel: Carbon steel
Quantity: 8 parts
Weight: 3 – 12,5t each
Industry: Energy
Location: Norway
Stay updated
Sign up now for the latest industry news, how-tos and exclusive offers
Bifurcated PipelineBifurcated Pipeline Levstal fabricated the bifurcated pipeline for the hydropower plant according to the customer’s drawing. The project was made […]Levstal Group2019-11-172019-11-17
Bifurcated PipelineLevstal GroupBifurcated Pipeline Levstal fabricated the bifurcated pipeline for the hydropower plant according to the customer’s drawing. The project was made […]piecehttps://levstal.com/wp-content/uploads/2019/12/bifurcated-pipeline_2_en.jpg01234567
Bifurcated Pipeline Levstal fabricated the bifurcated pipeline for the hydropower plant according to the customer’s drawing. The project was made […]Levstal Group