BIFURCATED PIPELINE

A hydropower plant in Norway was in need of a complex bifurcated pipeline, and Levstal was happy to help.

  • 3 - 12,5t WEIGHT
  • 8 parts QUANTITY
Bifurcated Pipeline_2_en
  • Energy
  • Norway

The entire project consisted of 8 different parts, and each part was done exactly how the client wanted them to be – in accordance to the drawing provided by that same client.

All 8 parts of the pipeline were created using carbon steel, and each part’s weight ranged from 3t to 12,5t. There were several parts in this particular project, including making a blank, as well as assembly, welding, painting, and so on – with delivery of the final product being the last one on the list.

Levstal is capable of providing many different services to the energy industry, such as turbines, platforms, pipe bridges, gas cleaning systems, and more. All of this is constructed with high standards of quality and with the help of the most cutting-edge machinery on the market.

HOW CAN WE
HELP YOU?

For your inquiry please complete the
form or email us on sales@levstal.com